Highways England Consultation

Highways England have commenced the A47 Blofield to North Burlingham consultation - Closed on 19 October 2018

The proposal will complete the gap in dual carriageway between Norwich and Acle. The consultation includes the proposal for the two junctions one to the east and west of the dualling scheme details can be found at https://highwaysengland.co.uk/projects/a47-blofield-to-north-burlingham/ 

Highways England have commenced the A47 Wansford to Sutton consultation - Consultation closes on 12th November 2018

The proposal will complete dualling between Peterborough and the A1. The consultation includes the proposal for the two junctions one to the east and west of the dualling scheme details can be found at https://highwaysengland.citizenspace.com/he/a47-wansford-to-sutton-statutory-consultation/ 

 

 Great Yarmouth Junctions

gap and guy

 Highways England documents can be downloaded here.

Thickthorn Junction 

thick

Improving the junction interchange to improve the access into Norwich.

Highways England documents can be downloaded here.

North Tuddenham to Easton dualling

tud to east

To provide continuous dual carriageway between Norwich and Dereham.

Highways England documents can be downloaded here.

Guyhirn Junction

Creation of a larger junction linking the A47 and A141.

Highways England documents can be downloaded here.