Current Priorities

The A47 Alliance have agreed on the priorities for Roads Investment Strategy 2 (2020- 2025), we believe that these 7 improvement schemes will improve connectivity along with A47. 

This shows the positive action local partners are taking to progress this vision and sets out our ‘ask’ to government if this vision is to be fully realised.

Current Priorities for the A47 Alliance (2020-2025)

Location

Scheme

Indicative Cost

Norfolk

Acle Straight Dualling

£78.4m

Norfolk

Tilney to East Winch Dualling (Including Hardwick flyover dualling)

£129.7m

Cambridgeshire

Peterborough to Wisbech Dualling

£TBC

Peterborough

J15 improvement scheme

£5-10m
Total Cost

                                                                                                                   TBC                                               

Longer Term Priorities (Post 2025)

Location

Scheme

Suffolk

Lowestoft Crossing

Norfolk / Suffolk

Great Yarmouth / Lowestoft Dualling
Norfolk Great Yarmouth Third River Crossing
Norfolk Dereham to Swaffham Dualling
Norfolk

East Winch to Swaffham Dualling

Cambridgeshire Wisbech Bypass Dualling
Cambridgeshire/Peterborough Thorney to Guyhirn Dualling
Cambridgeshire Thorney to Peterborough Dualling
Entire Route Full Grade Separation